SR 2020 SCOTT ST over LAUREL RUN

WBARRE CTY .7M N TR309BUS · County 079, Pennsylvania · Built 1929 · 2 Lanes · 5,909 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000024102
Year Built
1929
Reconstructed
1979
Length
13.7 m (44.9 ft)
Max Span
10.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
5,909
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$267,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.