I-81 NB over JOHNSON ALLAN SPRING RUN

W-B TWP .2 M N EXIT 165 · County 079, Pennsylvania · Built 1966 · 2 Lanes · 28,742 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000023739
Year Built
1966
Reconstructed
2022
Length
68.9 m (226 ft)
Max Span
15.5 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
28,742
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$57,000
Total Project Cost
$766,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.