I-81 NB over LUZ CO RAIL AUTHORITY

ASHLEY BO .5M N EXIT 165 · County 079, Pennsylvania · Built 1966 · 2 Lanes · 28,742 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000023738
Year Built
1966
Reconstructed
2022
Length
71.3 m (233.9 ft)
Max Span
26.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
28,742
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$554,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.