SR 75-PA 75 over FIRST ST & JUNIATA RIVER

PORT ROYAL BORO · County 067, Pennsylvania · Built 1937 · 2 Lanes · 5,419 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000020038
Year Built
1937
Reconstructed
1975
Length
331.6 m (1087.9 ft)
Max Span
68 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
5,419
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$1,907,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.