SR 75-PA 75 over NORFOLK AND SOUTHERN RR

PORT ROYAL BORO · County 067, Pennsylvania · Built 1910 · 2 Lanes · 5,419 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000020037
Year Built
1910
Reconstructed
2023
Length
23.5 m (77.1 ft)
Max Span
23.2 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
5,419
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$77,000
Total Project Cost
$1,036,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.