SR 80-I 80 over TSR 342 & FISHING CREEK

2 MI E EXIT 173 · County 035, Pennsylvania · Built 1969 · 2 Lanes · 10,748 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000012007
Year Built
1969
Reconstructed
1995
Length
117.3 m (384.8 ft)
Max Span
20.7 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
10,748
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$151,000
Total Project Cost
$2,035,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.