SR 80-I 80 over TSR 342 & FISHING CREEK

2 MI E EXIT 173 · County 035, Pennsylvania · Built 1969 · 2 Lanes · 11,293 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000012005
Year Built
1969
Reconstructed
1994
Length
131.4 m (431.1 ft)
Max Span
23.2 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
11,293
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$83,000
Total Project Cost
$1,118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.