I-70 WBL over TURNPIKE EXIT 161 RAMPS

OVER PA TURNPIKE EXIT 161 · County 009, Pennsylvania · Built 1963 · 2 Lanes · 6,095 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000004026
Year Built
1963
Reconstructed
2004
Length
50 m (164 ft)
Max Span
25.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
6,095
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$157,000
Total Project Cost
$2,114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.