RAMP A over RAMP B-3

RP.A OVER RP.B3-GLENFIELD · County 003, Pennsylvania · Built 1975 · 1 Lanes · 5,630 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002790
Year Built
1975
Length
49.1 m (161.1 ft)
Max Span
23.5 m
Width
10.8 m (35.4 ft)
Lanes
1
Daily Traffic
5,630
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,000
Total Project Cost
$305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.