RAMP B1 over 65 NB-SB RAMP A1 RAMP R
GLENFIELD BOROUGH · County 003, Pennsylvania · Built 1977 · 1 Lanes · 2,495 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.516667, -80.133333
This bridge is in worse condition than 38% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 49 years old.
Nearby Bridges
RAMP A over RAMP B-3
Built 1975
Neville Island Brg over CSX RR NS RR OHIO RIVER
Built 1976
RAMP-E TO 79 NB over NEV. IS. RAMP TO NB 79
Built 1972
OHIO RIVER BL over KILBUCK RUN
Built 1941
GLENFIELD VIAD BR over NSRR SR 65 E. BEAV. ST
Built 1988
RAMP B over RAMP A
Built 1977
RAMP 8017 SB over RAMP T TO SR 65 NB
Built 1976
OHIO RIVER BL over GLENFIELD ROAD
Built 1975
RAMP B2 (SR 8017) over RAMP A2
Built 1976
RAMP J over MAINT. YARD GRAND AVE
Built 1973
Bridge Details
- Structure #
- 000000000002789
- Year Built
- 1977
- Reconstructed
- 2010
- Length
- 147.8 m (484.9 ft)
- Max Span
- 45.7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 1
- Daily Traffic
- 2,495
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $41,000
- Total Project Cost
- $555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.