PARKWAY WEST over MCMICHAEL ROAD
AT INT W/ MCMICHAEL ROAD · County 003, Pennsylvania · Built 1951 · 5 Lanes · 77,308 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.430103, -80.135083
This bridge is in worse condition than 67.9% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 75 years old.
Nearby Bridges
CAMPBELLS RUN RD over Campbells Run
Built 2022
RIDGE ROAD over SR 0376 EB WB
Built 2005
SR 8009 RAMP H over CAMPBELL RUN RD AND RUN
Built 2008
RAYMOND P SHAFE HY over CAMPBELLS RUN RD
Built 1973
RAYMOND SHAFER HW over SR 0376
Built 1973
RAYMOND SHAFER HW over CAMPBELLS RUN RD
Built 1973
RAYMOND SHAFER HW over SR 0022
Built 1973
RAYMOND SHAFER HW over RAMP B TO 79 SB
Built 1973
PENN LINCOLN PY over CAMPBELLS RUN
Built 1972
RAMP F RD over BALDWIN RD {6014-02}
Built 1971
Bridge Details
- Structure #
- 000000000000557
- Year Built
- 1951
- Reconstructed
- 1981
- Length
- 32.6 m (107 ft)
- Max Span
- 14.9 m
- Width
- 28.8 m (94.5 ft)
- Lanes
- 5
- Daily Traffic
- 77,308
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $72,000
- Total Project Cost
- $975,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.