RAYMOND SHAFER HW over RAMP B TO 79 SB

I-79 NB OVER RAMP B · County 003, Pennsylvania · Built 1973 · 3 Lanes · 26,989 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000875
Year Built
1973
Reconstructed
2005
Length
56.7 m (186 ft)
Max Span
23.8 m
Width
17 m (55.8 ft)
Lanes
3
Daily Traffic
26,989
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$47,000
Total Project Cost
$630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.