FARGHER ROAD over DRY CREEK

2.4 MI S OF LONG HOLLOW R · County 065, Oregon · Built 1940 · 2 Lanes · 33 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
65C69 011300286
Year Built
1940
Reconstructed
1977
Length
15.9 m (52.2 ft)
Max Span
14.9 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
33
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.