LONG HOLLOW ROAD over DRY CREEK

0.6 MI. S. OF BOYD RD. · County 065, Oregon · Built 1959 · 2 Lanes · 97 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
08593 011 00608
Year Built
1959
Length
33.5 m (109.9 ft)
Max Span
13.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
97
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.