GOODPASTURE ROAD over MCKENZIE RIVER

230 MI E SPRINGFIELD · County 039, Oregon · Built 1938 · 2 Lanes · 999 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
39C118109400001
Year Built
1938
Length
72.5 m (237.9 ft)
Max Span
50.3 m
Width
5.7 m (18.7 ft)
Lanes
2
Daily Traffic
999
Material
Wood or Timber
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$838,000
Total Project Cost
$1,341,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.