OR 126 (HWY 015) over EUGENE WATER BOARD CANAL

2.7 MI E LEABURG PO · County 039, Oregon · Built 1997 · 2 Lanes · 5,079 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
18518 015 02259
Year Built
1997
Length
23.2 m (76.1 ft)
Max Span
23.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,079
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.