COUNTY RD 797 over COPCO SPILLWAY

4.67 MILEPOST · County 029, Oregon · Built 1930 · 2 Lanes · 1,345 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
29C280797 00467
Year Built
1930
Length
6.4 m (21 ft)
Max Span
3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
1,345
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.