OR 62 (HWY 022) over COPCO CANAL

21.7 N JCT HWY 230 · County 029, Oregon · Built 1963 · 2 Lanes · 1,834 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
16019 022 04409
Year Built
1963
Length
15.2 m (49.9 ft)
Max Span
15.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,834
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.