RUTLEDGE ROAD over ROSEBUSH CREEK
3.2 MI E OF HWY 97 · County 055, Oregon · Built 2022 · 2 Lanes · 93 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
45.340011, -120.717139
This bridge is in worse condition than 10.4% of bridges in County 055. The average bridge in Oregon is 0 years old; this one is 4 years old.
Bridge Details
- Structure #
- 24248 621 00325
- Year Built
- 2022
- Length
- 12.8 m (42 ft)
- Max Span
- 12.5 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 93
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.