US 97 (HWY 042) over SLAUGHTERHOUSE CREEK

015 MI S MORO · County 055, Oregon · Built 1961 · 2 Lanes · 3,745 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00817 042 01962
Year Built
1961
Length
9.1 m (29.9 ft)
Max Span
4.6 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
3,745
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.