COUNTY RD 20 over MIDDLE FORK JOHN DAY RIV

16.1 MI W US 26 · County 023, Oregon · Built 1996 · 2 Lanes · 217 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
23C202020 01610
Year Built
1996
Length
80.8 m (265.1 ft)
Max Span
35.1 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
217
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.