3600000 over MIDDLE FK JOHN DAY RIVER

.1 MI S INTER C20 & 36 RD · County 023, Oregon · Built 2002 · 2 Lanes · 80 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
060403000003007
Year Built
2002
Length
31.3 m (102.7 ft)
Max Span
30.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
80
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.