OR 82 (HWY 010) over WALLOWA RIVER

12.8 MI. E. UNION CO. LN. · County 063, Oregon · Built 2024 · 2 Lanes · 2,057 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
23877 010 04583
Year Built
2024
Length
148.1 m (485.9 ft)
Max Span
61 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
2,057
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.