UPPER DIAMOND LANE over BEAR CREEK

0.3 MI W OF HWY 82 · County 063, Oregon · Built 1970 · 2 Lanes · 521 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
09910 789 00327
Year Built
1970
Length
23.2 m (76.1 ft)
Max Span
22.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
521
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.