9TH St. over River Frontage
Astorias water Front · County 007, Oregon · Built 2019 · 2 Lanes · 5 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.190853, -123.833672
This bridge is in worse condition than 1.9% of bridges in County 007. The average bridge in Oregon is 0 years old; this one is 7 years old.
Nearby Bridges
10TH St. over River Frontage
Built 2020
8TH St. over River Frontage
Built 2020
7th St. over River Frontage
Built 2019
11TH ST. over River Frontage
Built 2019
6TH ST. over River Frontage
Built 2020
IRVING AVE over RAVINE
Built 2015
US101 (Hwy 9) over Columbia River
Built 1965
US101 (HWY 9) over Columbia River
Built 1966
US101 (HWY 9) over Columbia River
Built 1966
US101 (HWY 9) over Columbia River
Built 1966
Bridge Details
- Structure #
- 23060 000 00000
- Year Built
- 2019
- Length
- 18.2 m (59.7 ft)
- Max Span
- 11.3 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 5
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.