US101 (Hwy 9) over Columbia River
N END OF ASTORIA BRIDGE · County 007, Oregon · Built 1965 · 2 Lanes · 9,117 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.190881, -123.849572
This bridge is in worse condition than 33.5% of bridges in County 007. The average bridge in Oregon is 0 years old; this one is 61 years old.
Nearby Bridges
US101 (HWY 9) over Columbia River
Built 1966
US101 (HWY 9) over Columbia River
Built 1966
US101 (HWY 9) over Columbia River
Built 1966
US101 (HWY 9) over Columbia River & Hwy 92
Built 1966
6TH ST. over River Frontage
Built 2020
7th St. over River Frontage
Built 2019
8TH St. over River Frontage
Built 2020
9TH St. over River Frontage
Built 2019
10TH St. over River Frontage
Built 2020
11TH ST. over River Frontage
Built 2019
Bridge Details
- Structure #
- 07949D009 00000
- Year Built
- 1965
- Length
- 45.4 m (149 ft)
- Max Span
- 45.4 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,117
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $477,000
- Total Project Cost
- $763,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.