COUNTY RD 557.1 over WAGNER CREEK

5.26 MILEPOST · County 029, Oregon · Built 2010 · 2 Lanes · 66 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21389 557 00526
Year Built
2010
Length
18 m (59.1 ft)
Max Span
18 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
66
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.