COUNTY ROAD NO 971 over BEAR CREEK

0.03 MILEPOST · County 029, Oregon · Built 1956 · 2 Lanes · 12,443 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
07991 971 00003
Year Built
1956
Length
63.4 m (208 ft)
Max Span
10.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
12,443
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$666,000
Total Project Cost
$1,066,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.