US 30 (HWY 92) over Mill Creek

004 MI E ASTORIA · County 007, Oregon · Built 2014 · 2 Lanes · 12,211 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
21357 02W 09469
Year Built
2014
Length
36.6 m (120.1 ft)
Max Span
36.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
12,211
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.