DEL RIO RD (CO) over I-5 (001) WINCHESTER

03.7 MI N OF ROSEBURG NCL · County 019, Oregon · Built 2008 · 4 Lanes · 2,770 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20571 001C12922
Year Built
2008
Length
53.3 m (174.9 ft)
Max Span
53.3 m
Width
32.6 m (107 ft)
Lanes
4
Daily Traffic
2,770
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.