COUNTY RD 115 over SUTHERLIN CR

2.0 MI W OF WINCHESTER · County 019, Oregon · Built 1951 · 2 Lanes · 2,737 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
19C183 115 172
Year Built
1951
Length
26.8 m (87.9 ft)
Max Span
6.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,737
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.