DAYS CR CUT-OFF RD over SOUTH UMPQUA RIVER
5.0 MI E OF CANYONVILLE · County 019, Oregon · Built 1925 · 2 Lanes · 364 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.971261, -123.2141
This bridge is in worse condition than 39.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 101 years old.
Nearby Bridges
COUNTY RD 1 over A SMALL CREEK
Built 1959
TILLER-TRAIL HWY over SOUTH UMPQUA RIVER
Built 1989
TILLER-TRAIL HWY over DAYS CREEK
Built 2005
SHIVELY CR RD CR94 over BEALS CREEK
Built 1961
30 S 04 W 21.00: over Beals Creek
Built 2005
WOODS CR RD over DAYS CREEK
Built 1954
DAYS CR RD over DAYS CREEK
Built 1952
COUNTY RD 1 over OSHEA CREEK
Built 1959
DAYS CR RD over DAYS CREEK
Built 1952
GAZLEY RD CR#35 over S. UMPQUA RIVER OVERFLOW
Built 1965
Bridge Details
- Structure #
- 19C498 42 882
- Year Built
- 1925
- Reconstructed
- 1991
- Length
- 62.5 m (205.1 ft)
- Max Span
- 46.3 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 2
- Daily Traffic
- 364
- Material
- Steel
- Design
- Arch - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $656,000
- Total Project Cost
- $1,050,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.