DAYS CR CUT-OFF RD over SOUTH UMPQUA RIVER

5.0 MI E OF CANYONVILLE · County 019, Oregon · Built 1925 · 2 Lanes · 364 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
19C498 42 882
Year Built
1925
Reconstructed
1991
Length
62.5 m (205.1 ft)
Max Span
46.3 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
364
Material
Steel
Design
Arch - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$656,000
Total Project Cost
$1,050,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.