COUNTY RD 1 over OSHEA CREEK
1.0 MI E OF CANYONVILLE · County 019, Oregon · Built 1959 · 2 Lanes · 5,076 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.93115, -123.266425
This bridge is in worse condition than 75.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 67 years old.
Nearby Bridges
COUNTY RD 1 over CANYON CREEK
Built 1954
NE.Hamlin Drive over Canyon Creek
Built 1971
SO. MAIN STREET over CANYON CREEK
Built 1921
I-5 (HWY 001) over 5TH ST
Built 2008
I-5 (HWY 001) over FIRST ST
Built 1951
I-5 (HWY 001) over CANYON CREEK
Built 1951
I-5 (HWY 001) over CANYON CREEK
Built 1951
I-5 (HWY 001) over CANYON CREEK
Built 1951
I-5 (HWY 001) NB over IRWIN ACCESS
Built 2007
I-5 (HWY 001) over IRWIN ACCESS
Built 2007
Bridge Details
- Structure #
- 19C468 1 385
- Year Built
- 1959
- Length
- 47.9 m (157.2 ft)
- Max Span
- 18.3 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 5,076
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $503,000
- Total Project Cost
- $804,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.