I-5 (HWY 001) over FIRST ST
00.6 MI N CANYONVILLE SCL · County 019, Oregon · Built 1951 · 5 Lanes · 21,553 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.927278, -123.281192
This bridge is in worse condition than 39.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 75 years old.
Nearby Bridges
I-5 (HWY 001) over 5TH ST
Built 2008
COUNTY RD 1 over CANYON CREEK
Built 1954
SO. MAIN STREET over CANYON CREEK
Built 1921
NE.Hamlin Drive over Canyon Creek
Built 1971
COUNTY RD 1 over OSHEA CREEK
Built 1959
I-5 (HWY 001) over CANYON CREEK
Built 1951
I-5 (HWY 001) NB over IRWIN ACCESS
Built 2007
I-5 (HWY 001) over IRWIN ACCESS
Built 2007
I-5 (HWY 001) over CANYON CREEK
Built 1951
GAZLEY RD CR#35 over SOUTH UMPQUA RIVER
Built 1977
Bridge Details
- Structure #
- 07324 001 09851
- Year Built
- 1951
- Reconstructed
- 1966
- Length
- 27 m (88.6 ft)
- Max Span
- 11 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 5
- Daily Traffic
- 21,553
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $288,000
- Total Project Cost
- $461,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.