TILLER-TRAIL HWY over COFFEE CREEK

20.0 MI E OF CANYONVILLE · County 019, Oregon · Built 1989 · 2 Lanes · 2,467 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
19C476 1 2348
Year Built
1989
Length
55.5 m (182.1 ft)
Max Span
30.5 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
2,467
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.