REX BROWN ROAD over PANTHER CREEK

7 MI W OF CARLTON · County 071, Oregon · Built 2003 · 1 Lanes · 186 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
19880 000 00000
Year Built
2003
Length
19.6 m (64.3 ft)
Max Span
19.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
186
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.