03 S 05 W 20.00: over PANTHER CREEK

4.4 miles W of Carlton O · County 057, Oregon · Built 2002 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439357
Year Built
2002
Length
21.9 m (71.9 ft)
Max Span
21.7 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Slab
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.