FLOATING POINT RD over LITTLE DESCHUTES RIVER
1.5 MI N OF OR 58 · County 035, Oregon · Built 1980 · 1 Lanes · 73 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.4025, -121.79525
This bridge is in worse condition than 95.6% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 46 years old.
Nearby Bridges
OR 58 (HWY 018) over LITTLE DESCHUTES RIVER
Built 1995
NO DATA ENTERED over LITTLE DESCHUTES RIVER
Built 1950
HEMLOCK CR. RD. over HEMLOCK CREEK
Built 2008
CHINQUAPIN DR over LITTLE DESCHUTES R.
Built 2015
OR 58 (HWY 018) WB over US 97 (HWY 004) SB
Built 2008
CRESCENT CUTOFF RD over LITTLE DESCHUTES RIVER
Built 1962
CRESCENT CUTOFF RD over CRESCENT CR
Built 1972
OR 58 (HWY 018) over CRESCENT CREEK
Built 2006
US 97 (HWY 004) over GILCHRIST TIMBER RD.
Built 2005
NO DATA ENTERED over BIG MARSH CREEK
Built 2003
Bridge Details
- Structure #
- 19698 000 00000
- Year Built
- 1980
- Length
- 15.5 m (50.9 ft)
- Max Span
- 15.5 m
- Width
- 5.8 m (19 ft)
- Lanes
- 1
- Daily Traffic
- 73
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $212,000
- Total Project Cost
- $340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.