OR 58 (HWY 018) over LITTLE DESCHUTES RIVER

043 MI W HWY 4 · County 035, Oregon · Built 1995 · 2 Lanes · 1,899 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
17447 018 08220
Year Built
1995
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
1,899
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.