BULLY CR RD over BULLY CR CANAL

004 M E BULLY CR DAM · County 045, Oregon · Built 2004 · 2 Lanes · 312 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
19697 612 01521
Year Built
2004
Length
17.7 m (58.1 ft)
Max Span
16.8 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
312
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.