4TH AVE E C-826 over WILLOW CREEK EB

002 MI EAST HWY 26 · County 045, Oregon · Built 1977 · 2 Lanes · 45 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
45C103082600019
Year Built
1977
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
45
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.