LA CREOLE DRIVE over RICKREALL CREEK

0.03 MI N OF MILLER AVE · County 053, Oregon · Built 1997 · 3 Lanes · 2,119 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
19640 752100087
Year Built
1997
Length
36.5 m (119.8 ft)
Max Span
36 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
2,119
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.