OR 223 (Hwy 191)SB over Rickreall Creek

IN DALLAS · County 053, Oregon · Built 1918 · 2 Lanes · 7,225 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00231A191 00299
Year Built
1918
Reconstructed
1961
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
7,225
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$224,000
Total Project Cost
$359,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.