EAST BRIDGE ST over SALMON RIVER

0.05 MI FROM WELCHES RD · County 005, Oregon · Built 2004 · 1 Lanes · 97 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
19593 000 00005
Year Built
2004
Length
37.5 m (123 ft)
Max Span
36.6 m
Width
6.6 m (21.7 ft)
Lanes
1
Daily Traffic
97
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.