US 26 (HWY 026) over BEAR CREEK

3.0 MI E RHODODENDRON PO · County 005, Oregon · Built 2002 · 5 Lanes · 10,170 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
19115 026 04260
Year Built
2002
Length
8.7 m (28.5 ft)
Max Span
8 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
10,170
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.