422ND AVE over CEDAR CREEK

0.5 MILES S COALMAN RD. · County 005, Oregon · Built 1996 · 1 Lanes · 695 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
18395
Year Built
1996
Length
16.2 m (53.1 ft)
Max Span
15.5 m
Width
3.8 m (12.5 ft)
Lanes
1
Daily Traffic
695
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$170,000
Total Project Cost
$272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.