Hwy 172 over Deep Creek

3.5 MI S SANDY · County 005, Oregon · Built 1948 · 2 Lanes · 8,140 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03062 172 00208
Year Built
1948
Length
49.1 m (161.1 ft)
Max Span
19.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
8,140
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$516,000
Total Project Cost
$825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.