US 20 (HWY 017) over DESCHUTES RIVER

151 MI SE SISTERS · County 017, Oregon · Built 1993 · 3 Lanes · 16,149 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
17251 017 01509
Year Built
1993
Length
50.3 m (165 ft)
Max Span
19.8 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
16,149
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$528,000
Total Project Cost
$845,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.