TUMALO MARKET RD over DESCHUTES RIVER

.5 MI E CLINE FALLS HWY · County 017, Oregon · Built 1965 · 2 Lanes · 3,711 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03383AB75 00005
Year Built
1965
Length
43.9 m (144 ft)
Max Span
14.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
3,711
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$507,000
Total Project Cost
$812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.