OR 86 (HWY 12) over POWDER RIVER

080 M WEST OF RICHLAND OR · County 001, Oregon · Built 1987 · 2 Lanes · 589 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
16811 012 03186
Year Built
1987
Length
104 m (341.2 ft)
Max Span
42.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
589
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.